top of page

Expertise

Our most recent projects

For years, IEES a specialized division of BSV Consultores de Comercio Internacional, S.C. has played a key role in powering the energy sector through strategic logistics and customs management.

Salamanca
Thermoelectric Power Plant

01

This combined-cycle power plant includes two gas turbines and one steam turbine, with a total capacity of 870 MW. Located in the municipality of Salamanca, Guanajuato. Status: Under construction. Execution year: 2022. We are managing the importation of capital equipment and related accessories.

San Luis Potosí
Thermoelectric Power Plant

02

This plant consists of one gas turbine and one steam turbine, with a capacity of 435 MW. Located in the municipality of Villa de Reyes, San Luis Potosí. Status: Under construction. Execution year: 2022. We are managing the importation of capital equipment and related accessories.

Mérida
Thermoelectric Power Plant

03

This facility comprises one gas turbine and one steam turbine, with a capacity of 509 MW. Located at CFE Mérida, Km 8 Mérida–Umán Highway, Colonia Industrial, Mérida, Yucatán, Postal Code 97288. Status: Under construction. Execution year: 2023. We are managing the importation of capital equipment and related accessories.

Valladolid
Thermoelectric Power Plant

04

Equipped with two gas turbines and one steam turbine, this plant has a total capacity of 1,037 MW. Located at CFE Valladolid, Carretera Valladolid–Mérida Km. 8 s/n, Ebtún, Postal Code 97780, Valladolid, Yucatán. Status: Under construction. Execution year: 2023. We are managing the importation of capital equipment and related accessories.

Water Treatment Plant
Polígono Paraíso Project

05

We are handling the importation of all equipment, as well as international and domestic transportation.Located at Av. Chim Mz 01 (Manzana 01), Lot 185-02, SMZ-262, Benito Juárez Municipality, Cancún, Q.R., Postal Code 77553. Status: Under construction. Execution year: 2024.

Water Treatment Plant
PTAR El Ahogado

06

Located at Av. Los Laureles No. 1000, Col. Las Chivas, Tlajomulco de Zúñiga, Jalisco, Postal Code 45679. Status: Under construction. Execution year: 2024. We are managing the importation of all equipment, including international and domestic transportation.

Adolfo López Mateos
Thermoelectric Plant

07

Importation of equipment, materials, and tools for the construction of the Tuxpan Combined Cycle Plant, located at KM 6 north of the mouth of the Tuxpan River, Col. Isla Potreros, Tuxpan, Postal Code 92784. Status: Under construction. Execution year: 2024. This project does not include capital parts.

Additional Projects Throughout the Years: • IBERDROLA - LA VENTOSA I Gamesa Team. Construction of the first phase of a 20 MW Wind Power Plant with 10 wind turbines, GAMESA technology. Located in La Ventosa, Oaxaca. Status: Operating. Execution year: 2009. - LA VENTOSA II Gamesa Team. Expansion of La Ventosa I to 40 wind turbines, installed capacity, model G80. - LA VENTOSA II Gamesa Team. Expansion of La Ventosa I and II to 102 MW of installed capacity with a total of 40 wind turbines, model G80. - LA VENTOSA III 121 wind turbines with 102 MW of installed capacity. - ENERTEK EXPANSION Importation of the Cogeneration Plant for Expansion. 110 MW of power and 170 ton/hr of steam. - PEMEX CONVEYANCE RACK Importation of steel pipeline for conveyance at PEMEX refinery in Salamanca - CCC COGENERATION SALAMANCA Importation of equipment for Power Plant. 430 MW capacity. - PIER II QUECHOLAC Gamesa Team, model G80. Importation of 33 wind turbines, 66 MW capacity. - COGENERATION RAMOS, S.A. DE C.V. Supply of two Power Islands. Recovery Boiler, Gas and Steam Turbogenerator System, with 52 MW of capacity, using GE technology. Located in Coahuila. Status: Operating. Execution year: 2015. - 36 CC BAJA CALIFORNIA III Supply of one Power Island: Recovery Boiler, Gas and Steam Turbogenerator System, with 300 MW of capacity, using GE technology. Located in “La Jovita,” Baja California Norte. Status: Operating. Execution year: 2015. - CCC COGENERATION SALAMANCA PROJECT Importation of equipment for Power Plant, 430 MW capacity, using GE technology. Located in Salamanca, Guanajuato. Status: Operating. Execution year: 2016. - QUINTA UNIDAD Expansion of the Fifth Unit of the Combined Cycle Plant in the Dulces Nombres Complex, with 1,121 MW capacity, using ALSTOM technology. Located in Pesquería, Monterrey. Status: Operating. Execution year: 2016. - BAJÍO COGENERATION Cogeneration Plant for steam and electricity production to meet the needs of Kimberly Clark. 54 MW of capacity, using TOSHIBA technology. Located in Bajío, Querétaro. Status: Operating. Execution year: 2016. - ALTAMIRA Importation of equipment for Altamira Cogeneration Power Plant. 56 MW of electricity and 38 tons of steam for specialized plastics production. - NORTHEAST ESCOBEDO Combined Cycle Plant, 850 MW capacity, located in Escobedo, Monterrey. Status: Operating. Execution year: 2017. Responsible for importing the various systems carried out by Iberdrola, excluding major components. - SANTIAGO PHOTOVOLTAIC PARK Solar park located in the municipality of Santiago. Importation of solar panels for this project with a capacity of 170 MW. A total of 1,000 containers imported through the Manzanillo customs office. Status: Operating. Execution year: 2017. - EL CARMEN Combined Cycle Plant, 866 MW capacity, located in Escobedo, Monterrey. Status: Operating. Execution year: 2018. Responsible for importing the various systems carried out by Iberdrola, excluding major components. - TOPOLOBAMPO III Solar park located in the municipality of Cuyoaco. Importation of solar panels for this project with a capacity of 200 MW. A total of 1,100 containers imported through the Lázaro Cárdenas customs office. Status: Operating. Execution year: 2020. - TAMAZUNCHALE II Combined Cycle Plant, 1,150 MW capacity, located in the municipality of Tamazunchale, San Luis Potosí. Status: Under construction. Execution years: 2020 and 2021. Responsible for importing the various systems carried out by Iberdrola, excluding major components. • GAS NATURAL - 29 CCC NORTE Construction of a Combined Cycle Plant with one gas turbine and one steam turbine, with a capacity of 391.5 MW, using SIEMENS technology. Located in Durango. Status: Operating. Execution year: 2007. • GRUPO AVANZIA - ALTAMIRA Importation of equipment for Altamira Cogeneration Power Plant. 56 MW of electricity and 38 tons of steam for specialized plastics production. - NORTHEAST ESCOBEDO Combined Cycle Plant, 850 MW capacity, located in Escobedo, Monterrey. Status: Operating. Execution year: 2017. Responsible for importing the various systems carried out by Iberdrola, excluding major components. - SANTIAGO PHOTOVOLTAIC PARK Solar park located in the municipality of Santiago. Importation of solar panels for this project with a capacity of 170 MW. A total of 1,000 containers imported through the Manzanillo customs office Status: Operating. Execution year: 2017. - 167 CC SAN LORENZO C onversion of Gas Turbine to Combined Cycle. 130 MW capacity. - CCR LA CANGREJA Construction of a catalytic reforming plant. Wind park. Participation in the importation of anchor bolts and grout for foundation. - NUEVO PEMEX GAS PROCESSING COMPLEX Construction and Commissioning of Sweetening and Condensate Stabilization Plants No. 2, 3, and 4, Construction and Commissioning of Hydrocarbon Fractionation Plants No. 1 and 2. Located in Villahermosa. Status: Operating. Execution year: 2016. - CADEREYTA DIESEL REMODELING First Stage. Importation of reactor and catalysts for the Cadereyta refinery. - TG7 MADERO PROJECT Gas turbogenerators and heat recovery system. At the “Francisco I. Madero” refinery in Cd. Madero, Tamps. - DUBA PROJECT Ultra-low sulfur diesel. New diesel hydrodesulfurization plant. - NITROGEN-BASED FERTILIZERS Rehabilitation of the nitrogen-based fertilizers plant in Coatzacoalcos, Ver. - VALLE DE MÉXICO II. 750 MW combined cycle power plant. - CADEREYTA DIESEL REMODELING PROJECT Remodeling of the Ing. Héctor R. Lara Sosa Refinery. First stage includes importation of a reactor and catalysts. Located in Monterrey. Status: Operating. Execution year: 2017. - ALFA COGENERATION Combined Cycle Cogeneration Plant with two gas turbines and two condensing steam turbines with 850 MW capacity, using SIEMENS technology. Located in Altamira. Status: Under construction. - SOLAR PLANT - FV SANTA MARÍA Construction development of a 166 MW solar park located in Santa María, Chihuahua. - SOLAR PLANT - FV OREJANA Construction development of a 126 MW solar park located in La Orejana, Hermosillo. - SOLAR PLANT - FV XOXOCOTLA Construction development of a 70 MW solar park located in Cuernavaca, Morelos. - SOLAR PLANT - FV MEX SOLAR I Construction development of a 30 MW solar park located in Allende, Guanajuato. - SOLAR PLANT - FV MEX SOLAR II Construction development of a 43 MW solar park located in Allende, Guanajuato. • ABENGOA S,A. de C.V. - 167 CC SAN LORENZO C Conversion of Gas Turbine to Combined Cycle. 130 MW capacity. - CCR LA CANGREJA Construction of a catalytic reforming plant. - CT AGUA PRIETA II Hybrid solar-gas power plant, ISCC (Integrated Solar Combined Cycle) technology. Includes a solar collector field for steam production for the TV.14 - CCC MORELOS 264 GE equipment, 4 power islands with a capacity of 642.33 MW in combined cycle configuration. - ABENT 3T Expansion of the Nuevo Pemex Cogeneration Plant. New combined cycle train (gas turbogenerator system plus steam turbogenerator system). - BAJA CALIFORNIA SUR IV Importation of equipment for the construction of the I.C.C. Internal combustion plant with a diesel engine and generator. 42.7 MW capacity. - ABENT 4 GE technology. Importation of equipment for Abent 4T. • TECHINT S.A. de C.V. - 38 CC NORTE III GE technology. Combined cycle plant composed of two power islands with gas and steam turbines. Capacity: 928 MW. Located in Samalayuca Sur, 30 km from Cd. Juárez, Chihuahua.

bottom of page